200t/H Capability Large Rd Sequence Asphalt Mixing Plant
one. The mixer use CZPTpean technologies massive obliquity, powerful screw flow, sound three- dimensional compulsory mixing, which will form effectively boiling layer and as a result obtain effectively-proportioned mixing for the duration of a short time.
2. Asphalt weighing and spraying device use high-velocity flux asphalt pump to understand substantial-stress shower spraying asphalt, making sizzling aggregate, filler and asphalt blended a lot more speedily, equably shorten the mixing time and enhance the ourput.
three. Vibrating screen use whole airproof vibrating display whose eccentricity shaft is placed above and its swing assortment can be controlled. This can realize practical routine maintenance.
4. The sizzling mixture elevator is with our patent framework( patent No.: 200520128222.eight). This element is for double-row double-ear chains, manual sliding wearable content hopper elevating, composite discharging the material with dependable efficiency.
five.Cold mixture source program use Modularize style, convenient transportation and installation and can adjust cold combination feeding position use frequency conversion timing motor for feeding, react sensitively alter feeding specifically
six. Filtering method use two-stage whole dust filtering venture, effectively handle dust to quality
use imported filtering bag, water-proof, oil-evidence, properly warmth-resistant, which proficiently protract the using daily life.
seven.CZPT handle technique use CZPT well-known model and global higher top quality electric management components to isnure the capacity of the equipmentWith fault-detecting and analysis alarming capacity, hassle-free for saving the instructions for materials giving proportion and printing report forms
8.Drying drum:The material-raising blades style is sensible and the burning region construction is with patent technological innovation (patent No.: 20052057174), which can make cold combination mix a lot more equably, and with large heat efficiency
No. |
Elements Title | Areas total energy (KW) |
Remark |
|
1 | Cold aggregate provide technique | thirteen.five | ||
2 | The tilted belt feeding conveyer | 5.5 | ||
three | Drying drum | 74 | ||
four | Oil burning system | 96.five | ||
five | Hotaggregate elevator | 15 | ||
six | Bag dust catcher system | a hundred and forty four.12 | ||
7 | Mixer tower assembly | vibrating monitor | 11 | |
Mixer | seventy four | |||
Asphalt spraying system | 15 | |||
8 | Filler provide system | 8 | ||
9 | Pneumatic system | 11 | ||
10 | Asphalt supply method | 32.95 | ||
The plant total installed energy |